17
Jun

First Solar Moapa

Bombard Utility Scale Projects Bombard Electric performed the balance of systems for the second half of the First Solar project on the Moapa River Indian Reservation north of Las Vegas. The utility-scale solar project is generating a total of 250 megawatts on a 2,000-acre site and includes an on-site substation and a new five-and-a-half-mile transmission line connecting the site to
Read more
17
Jun

Three Square

Bombard Commercial Projects Bombard installed 1,444 Heliene 72M-365W solar modules on the roof of two buildings and the Three Square Food Bank campus in Las Vegas. The roof mounted systems utilize a ballasted racking solution with minimal roof penetrations. Three Square is Southern Nevada’s only food bank providing food assistance to the residents of Lincoln, Nye, Esmeralda and Clark Counties.
Read more
1
Nov

Playa 1 & 2

Bombard Utility Scale Projects This ground mount utility-scale photovoltaic installation is comprised of roughly 1.9 million 117.5 and 120 watt modules, along with 48 inverters. Bombard self performed installation, excluding piers. The project spans more than 1,700 acres. Project Case Study
24
Oct

City of Reno Parking Gallery

Bombard Government Projects The Reno Event Center Parking Gallery solar PV system consists of 180 Kyocera 205 watt solar modules and one SMA 36 kW grid interactive inverter. The installation strategy adapted an existing steel and concrete parking canopy to accept the racking and modules at a five degree tilt. Project Case Study
3
Oct

Las Vegas Fire Station 106 Stella Lake

Bombard Government Projects This project consists of a ballasted rooftop and solar support structure PV systems. The rooftop system uses 150 SunPower 230 watt solar panels, while the solar support structures in the parking lot uses 480 Sharp 240 watt solar panels. Together, the system provides the City Hall of North Las Vegas with 149.7 kW of clean renewable energy.
Read more
3
Oct

Red Rock Fire Station

Bombard Government Projects Bombard Renewable Energy completed this installation of a 64.8 kW off‐grid solar PV system for the BLM in the Spring of 2012. The system, which completely powers the Red Rock Canyon National Conservation Area Fire Station, uses 270 Sharp 240 watt solar modules and five 8000 watt Outback inverters. Because the fire station does not have grid
Read more
3
Oct

VA Hospital

Bombard Government Projects
3
Oct

UNLV RAJ & HAM

Bombard Government Projects In 2012, UNLV requested proposals for two 50 kW AC CEC solar PV systems, one on the Rogers Administration and Justice building and one on the HAM Concert Hall. The system was built using Sharp 240 solar panels and a ballasted racking system. The system had a very short construction schedule and was completed before the university’s
Read more
3
Oct

Silver Peak NV Municipal Well

Bombard Government Projects Silver Peak is one of the oldest mining communities in Nevada. It was founded near a well in 1864, two years after the founding of surrounding Esmeralda County. The Silver Peak’s system consists of 54 Sharp 235 watt solar modules and 2 SMA 7000 watt grid interactive inverters. This system is used to help power the water
Read more
3
Oct

Red Rock Fire Station & Campground

Bombard Government Projects The Red Rock Fire Station & Campground solar photovoltaic pole mounted and covered parking installation was completed in 2014. The installation of the pole mounted and covered parking of the Red Rock Fire Station and Campground consists of 288 Sharp 240 watt modules, and uses 8 SMA grid interactive inverters, which produces approximately 109,422 kWhr of energy
Read more